Big Welcome to the OFFICIAL Khon Kaen Forum!

Visit the Wild & Crazy Khon Kaen Forum Discussion Group on facebook


Author Topic: Double track (Jira to KK) and Train Station (KK) Progress  (Read 319 times)

avvocato

  • Full Member
  • ***
  • Posts: 132
    • View Profile
Double track (Jira to KK) and Train Station (KK) Progress
« on: April 05, 2018, 05:27:26 PM »

http://bit.ly/2ElXL2f
Progress report on the ongoing railway construction - 70% complete on the elevated rails and train station in KK (if I read that right). It is interesting to note that the old tracks will remain and be used for some needs until plans for the second phase of the Thai Chinese high-speed railway from Nakhon Ratchasima to Nong Khai (Phase 2) materialize, whatever that means and however long that takes, apparently. Only in December 2017 did a small section of the High Speed Railway between Bangkok and Korat (Phase 1) get a contract awarded.
« Last Edit: April 05, 2018, 07:30:52 PM by Rex (Admin) »